Skip to content
SafetyCulture
Template

Windows and Doors Installation Progress Report

by Mary Krastev, from the Community

Downloads: 0
Get this template

Use this progress report template to document windows and doors installation on site. Record project details, dates, locations, and plot numbers; attach photos; note materials used, measurements, and installation steps; log defects and issues; and capture sign-off with site manager name and signature. Ideal for contractors and site managers to standardize reporting, improve quality control, and maintain compliance across multiple plots and phases.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.