Windows and Door Installation Handover Checklist
by Kate Burgan, from the Community
Use this handover checklist to confirm quality and safety after windows and door installation. Capture address and MP number, then verify operation, locking, and ventilation for each room. Check handles, restrictors, trickle vents, sealant application, fixings to masonry, trims, and draught sealing. For doors, confirm security chain, correct closer operation, drainage holes, weather bar caps, numbers, and letterbox fitting. Suitable for site managers and customers to sign off completed work.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
