Skip to content
SafetyCulture
Template

V-WIS013 Damp Proof Membrane Inspection Sheet

by Olivia Philpotts, from the Community

Downloads: 10+
Get this template

This V-WIS013 Work Inspection Sheet helps construction teams verify the quality and compliance of damp proof membrane works. Record contract details, scope of works, subcontractor, and the precise area inspected with drawing references. Confirm materials are approved, manufacturer instructions are followed, and substrates are prepared correctly. Check water levels and precautions, keep surfaces dry, and verify concrete, screed, brickwork, and blockwork finish quality. Assess ventilation in confined spaces and inspect membrane application, lap joints, and curing. Ensure ambient temperature is 5 degrees C or above during installation. Protect the membrane from follow-on trades, store materials in dry conditions at 5 degrees C or above, and stack rolls as recommended. Capture supporting documentation, add comments, and complete the final pass/fail inspection with sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.