This checklist supports quality control inspections for Tyvek breather membrane installation on building elevations and floor levels. It guides users to confirm joints are sealed and damage free, validate horizontal and vertical lap overlaps at 100 mm and 150 mm, record issues, and capture corrective actions and reinspection. Sections cover elevations, scaffold levels, and floors, with space for notes and photos. A completion step includes name and signature to confirm due diligence and sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
