Use this post completion survey to verify a newly fitted kitchen meets design and specification. Inspect unit levels and door alignment, worktops, splashbacks, plinths, flooring, and sink taps. Validate electrical works including rewiring to spec, labeled consumer unit, level sockets, earth bonding, lighting, detectors, extractor fan, and electrical certification. Check plumbing: replaced hot and cold pipes, washing machine plumbing, waste pipe, gas chain, and gas certification. Includes MD Group and customer sign-off for quality handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
