Use this post completion survey to verify a kitchen installation meets design and safety specifications before handover. Inspect unit alignment, worktops, plinths, flooring, sinks and taps, and door operation. Confirm electrics and rewire to spec, consumer unit labeling, socket levels, earth bonding, lighting, detectors, and extraction. Check plumbing: pipe replacement, waste, appliance connections, and gas chain. Record certifications and capture both contractor and customer sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
