Skip to content
SafetyCulture
Template

SDC Kitchen Post Completion Survey

by Talitha Burton, from the Community

0
Get this template

Use this post completion survey to verify a kitchen installation meets design and safety specifications before handover. Inspect unit alignment, worktops, plinths, flooring, sinks and taps, and door operation. Confirm electrics and rewire to spec, consumer unit labeling, socket levels, earth bonding, lighting, detectors, and extraction. Check plumbing: pipe replacement, waste, appliance connections, and gas chain. Record certifications and capture both contractor and customer sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.