This kitchen completion post-inspection form helps confirm that all works are finished to a high standard and the space is ready for handover. Verify cleanliness and making-good of adjacent walls, check carpentry quality, ensure worktops are level and unmarked, and that cupboards and drawer packs operate correctly. Confirm plumbing is satisfactory, the sink is free from scratches, and isolators, stop tap, and washing machine outlet trap are present. Assess flooring condition and adhesion. Check electrical works, including secure, level socket fronts, three double sockets, and fitted fused spurs. Capture tenant and operative signatures for final sign-off and satisfaction.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
