Skip to content
SafetyCulture
Template

AJK Kitchen Completion

by A&J keith, from the Community

Downloads: 20+
Get this template

Use this AJK Kitchen Completion checklist to inspect and sign off a newly installed or renovated kitchen. Verify painting, plastering, joinery, plumbing, flooring, and electrical work, and capture photo evidence of satisfactory and unsatisfactory items, including details like Mason Mitre, under sink work, and all drawers. Confirm the kitchen is clean and tidy, and record both tenant and operative signatures to document customer satisfaction and final handover. Includes fields for date, preparer, location, and media attachments to standardize completion and sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.