Use this electrical mid and post walk round checklist to document installation and handover tasks for domestic heat pump systems. Capture photo evidence of Samsung controller operation and serial numbers, labelled fuse spurs, external rotary isolator, heat pump unit, and fitted room thermostat. Record commissioning details in the electrical section and heat pump booklet. Confirm customer understanding of controls, schedules, hot water timing, shutdown, and system use. Gather feedback and obtain customer and engineer signatures to close out the job.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
