Skip to content
SafetyCulture
Template

Taggas Mid and Post Install Walk Round

by Tim Devlin, from the Community

Downloads: 10+
Get this template

This template guides engineers through a mid and post install walk round for heat pump systems. Capture photo evidence of the unit, cylinder, radiators, TRVs, pipework and lagging; record serial numbers and data plates; verify condensate termination, thermostat operation, Samsung controller setup, glycol levels and strainers. Include paperwork checks such as warranty card, commissioning checklist, cylinder benchmark and BIB or DOCC forms. Finish with customer handover by demonstrating controls, hot water timing and system isolation, confirming satisfaction and tidy site, then collect customer and engineer signatures with date and time.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.