Mid and Post Installation Walkaround Checklist
by Kat devlin, from the Community
This checklist guides mid and post installation walkarounds for heat pump and hot water cylinder systems. It prompts photo evidence during and after install, including controllers, thermostats, serial plates, lagging, glycol use, strainer, condense termination, and system operation. It also covers paperwork evidence such as warranty cards, commissioning checklists, and benchmark sheets. A customer handover section confirms understanding of controls, hot water timing, isolation points, and overall satisfaction, with customer and engineer sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
