Skip to content
SafetyCulture
Template

Mid and Post Installation Walkaround Checklist

by Kat devlin, from the Community

Downloads: 10+
Get this template

This checklist guides mid and post installation walkarounds for heat pump and hot water cylinder systems. It prompts photo evidence during and after install, including controllers, thermostats, serial plates, lagging, glycol use, strainer, condense termination, and system operation. It also covers paperwork evidence such as warranty cards, commissioning checklists, and benchmark sheets. A customer handover section confirms understanding of controls, hot water timing, isolation points, and overall satisfaction, with customer and engineer sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.