Skip to content
SafetyCulture
Template

Air Source Heat Pump Completion Document

by Steve Reynolds, from the Community

Downloads: 20+
Get this template

This air source heat pump completion document helps installers commission and hand over a new system. Record site details, equipment make and model, serial numbers, and required photos. Verify electrical tests including resistance to earth and short circuit checks, confirm sensor readings, and set control parameters such as heat curve, flow temperatures, domestic hot water start and stop, auxiliary power, and legionella cycle. Check unit installation and clearances, base or brackets, vibration isolation, condensate drainage, and insulation. Assess the central heating system including emitter types and count, system pressure, expansion vessel charge, flushing and cleaning, water treatment, pump settings, and inhibitor. Confirm controls setup and customer handover in line with MIS 3005 requirements. Capture radiator and controls images and collect engineer and customer signatures with date and time.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.