Power Cable Check Sheet - Pre Energisation
by Diarmuid O'Donovan, from the Community
Use this ITR-09 checklist to verify power cable condition and readiness before energisation. It covers visual inspection and tagging, correct type and size, terminations at source and destination, supports and glands, continuity and phasing tests, insulation resistance at 500V or 1000V, ductor measurements on bolted connections, and torque marks. Includes close-out items such as as-constructed drawings, fit-for-service confirmation, comments, license number, and sign-off.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
