Skip to content
SafetyCulture
Template

ESSW Initial Energisation Pre-Power Checklist

by Melvin keyani, from the Community

0
Get this template

Use this ESSW initial energisation and pre-power checklist to prepare electrical systems for commissioning. Verify permits and approvals, review dead test results and cable checks, confirm main supply installation and testing, earthing and bonding, lightning protection, EPO installation and operation, labeling and torque settings, and switch room security and signage. Ensure safety equipment, lighting, fire stopping, housekeeping, and earth pits are in order. Includes sign-off for Duty Holder, Authorised Person, and Project Manager.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.