Skip to content
SafetyCulture
Template

Porter Plant - Off Hire Condition Report 1.6

by James Saker, from the Community

Downloads: 10+
Get this template

This Off Hire Condition Report template helps Porter Plant teams and customers document equipment and vehicle returns at the end of hire. Capture required off-hire details, depot location, odometer or hours, and service status. Complete a visual inspection with photos, record any damage, cleanliness, fuel levels, emulsion disposal, tyre condition, and spare tyre. Verify safety equipment and accessories such as first aid kit, spare key, fire extinguisher, and UHF. Ensure all required documents are returned, including risk assessment, operations manual, and daily check sheets. Record attachments and ground engaging tools with wear percentage and replacement estimates. Conclude with inspector and customer signatures and comments.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Porter Plant Off Hire Condition Report Template 1.6 | Free Template