Skip to content
SafetyCulture
Template

NQBP Blockwork Walls ITP for Booster Pump Station

by Adam Wright, from the Community

Downloads: 0
Get this template

A practical Inspection Test Plan template for building blockwork walls on the NQBP Booster Pump Station project. It covers site details, setout checks, reinforcement requirements for starter bars, vertical and horizontal bars, concrete core fill strength and slump, a pre pour inspection hold point by consultants, photo records of concrete dockets, and builder and consultant sign off. Use this as a starting point only and seek professional advice for your site and jurisdiction.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.