MBC Kitchen and Bathroom Handover Form
by Hvancraeyenest Vancraeynest, from the Community
This kitchen and bathroom handover checklist helps verify the quality of newly installed rooms before client sign-off. Inspect plaster, paintwork, tiling, flooring, worktops, sinks and seals, cabinetry, and pipework for damage or defects. Test electrics, lighting, sockets, extractor fan and smoke detectors, and confirm gas and electric cooker provisions, including a cooker chain where required. Check for leaks, ensure stop tap operation, and leave a complete handover pack on site. Record snags, add notes, and capture evidence to streamline remediation and final approval.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
