This construction pre-start report helps site supervisors and framing crews verify readiness before work begins. Cover key areas including materials and hardware availability; slab checks for overhang, termite barrier installation, and required reports; onsite utilities such as power, water, temporary fencing, toilets, bins, and OH&S signage; delivery logistics with clear street and driveway access, ground conditions, overhead powerlines, and whether a franna is needed; and process planning such as two-plank use, scaffold requirements, lower truss scope, retaining walls, flooring type (hebel or yellow tongue), garage roof trimming, balcony fall setup, and confirming crews have all relevant layouts. Capture job site photos and record responsible parties to streamline safe, efficient build starts.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
