Use this pre-start slab report to assess material deliveries, hardware, frames, and termite barriers; verify site power, fencing, sanitation, water, and clear access; plan deliveries and lifting needs; and confirm structural tasks including column plumb, anchor bolts, beam levels, and required cleats. Capture job site photos, document rectification work, and leave the site clean. Designed for builders and site supervisors conducting steel installation on new slabs.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.