Use this LUCA excavation checklist to audit trench and excavation safety on site. Verify utility locates and UPC dig tickets, require hand digging near marked lines, and ensure a competent person inspects conditions daily and after rain. Confirm proper sloping or trench boxes with tabulated data, safe ladder access within 25 feet, and spoil piles 2 feet from edges. Check barriers for unattended trenches, high-visibility apparel, safe distances from suspended loads, functioning equipment alarms, and required PPE.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
