Use this structured checklist to plan and verify works for the Hackney electrical project POC by Alphatrack Systems. Sections cover distribution board changes, RCBO and SPD installation, board labeling, and test completion. Fire detection tasks include panel photos, new spur, document box, wiring, communal and in-property detectors, firemans switch with lockable cover and padlock, manual call points with covers, a mounted building schematic, and test signoff. Door entry covers panel, new or existing wiring, release keep, external junction boxes to flats, sample property handsets, and testing. Emergency lighting captures fitted fixtures, key switch installation, photo evidence, counts, and final signoff.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
