Skip to content
SafetyCulture
Template

Hackney Electrical Project POC - Alphatrack Systems

by Andy Holland, from the Community

0
Get this template

Use this structured checklist to plan and verify works for the Hackney electrical project POC by Alphatrack Systems. Sections cover distribution board changes, RCBO and SPD installation, board labeling, and test completion. Fire detection tasks include panel photos, new spur, document box, wiring, communal and in-property detectors, firemans switch with lockable cover and padlock, manual call points with covers, a mounted building schematic, and test signoff. Door entry covers panel, new or existing wiring, release keep, external junction boxes to flats, sample property handsets, and testing. Emergency lighting captures fitted fixtures, key switch installation, photo evidence, counts, and final signoff.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.