This electrical project site checklist supports Alphatrack Systems teams working at the Hackney site. Use it to record distribution board changes, SPD installation, board labelling and testing. Capture details and photos for the fire detection system, including panel, new spur, fire document box, new wiring and detectors installed in communal areas and individual properties, plus sample property numbers. Verify the firemans switch with lockable cover and FB padlock. For the door entry system, document the panel, new or existing wiring, release keep, external junction boxes and flat handsets, with photos and tests. For emergency lighting, note quantity installed per property, key switch, photos and test results. Finish with engineer sign off to confirm completion and accountability.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
