This checklist supports the Hackney Electrical Project proof of concept by guiding teams through key installation and verification steps. It covers distribution board changes, SPD installation, correct labeling, and photo evidence. Sections include fire detection systems (new spurs, document boxes, wiring, detectors in communal areas and properties, and fireman’s switch with lockable cover), door entry systems (panels, new or existing wiring, release keeps, junction boxes, handsets), and emergency lighting (fixtures, key switch). It concludes with testing verification and client sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
