Use this electrical services sign off checklist to verify rough-in before wall closures. Confirm metal accessory boxes are at the correct height and securely fixed, cables run within designated zones or are protected, grommets are installed at metal entries and studs, and accessory positions match current drawings. Check coordination with other services, note heights for cables not in boxes, ensure pattress is installed where required, and capture sign off with name, company, job title, date, and site details.