This checklist supports compliant Energex conduit installation aligned with AS NZS 3000. It covers pre start verification, locating services, set out photos, trench width and depth, bedding sand, joint preparation, depth of cover, marker tape to AS2648, and compaction requirements. It also references roadway backfill with lean mix concrete and relevant standard drawings, helping teams document issues, evidence, and sign offs in the field.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
