Skip to content
SafetyCulture
Template

CB Group ITP-001 Pit Installation Checklist

by Warren S, from the Community

Downloads: 10+
Get this template

CB Group ITP-001 Pit Installation provides a structured inspection and test plan for installing utility pits for traffic signals, street lighting, ITS and communications, and Energex works. It covers risk assessment, site pegging and suitability, service location, excavation depth, drainage bedding, superintendent hold and witness points, conduit entry depths and clearances, pre backfill approvals and survey, and final protection, sealing, and housekeeping. Use it to document photos, signatures, and compliance with MRTS91 and TMR requirements.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.