This Footing Installation Inspection and Test Plan helps construction teams document and control the installation of street lighting and traffic signal footings to TMR and Energex requirements. It covers pre-construction checks, underground and overhead services verification, footing location and depth approvals, hold and witness points, retaining wall criteria, conduit placement, concrete mix selection and placement per MRTS70 and MRTS92, vibration and finish quality, superintendent sign-off, and site safety housekeeping.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.