This Inspection Test Plan supports conduit installation works at the Stapylton Landfill facility. It guides crews through key quality checks including saw cutting of roadway, trench excavation to required depth, placement of bedding sand, verifying conduit cover, installing marker tape, and staged backfilling with lean mix. It also covers asphalt reinstatement with tack coat, DG14 key in and wearing courses, compaction, and PMB joint sealing, with photo evidence prompts for each step.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.