Use this A204.1 Plumbing Final Fix checklist to complete final-stage plumbing QA before handover. Verify fixtures and sanware match schedules; baths, basins, toilets and vanities are level and secure; wastes, traps, pan connectors, angle valves and flexi connectors are leak-free; mixers and taps sealed and covered; showers and roses secure; solar/heat pump connections installed correctly; adequate sealant applied; full pressure tests completed; sewer inspected and flushed; rodding eyes installed to NGL; COC issued; housekeeping, PPE, safety file and sign-offs recorded.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
