This A203.1 Plumbing 2nd Fix checklist guides site teams through final plumbing tasks before handover. Verify sanitary ware schedules, tidy and secure pipework and ducting, correct mixer and wallplate elbow positions and depths, vent pipe installation, shower rose height and traps, PRV placement, and water supply pressure testing. Includes pre-work housekeeping checks, required PPE, and approvals with subcontractor and foreman sign-offs.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .