Skip to content
SafetyCulture
Template

1st Fix Partition Handover Checklist

by Oleksandr Berezii, from the Community

0
Get this template

This 1st fix partition handover checklist helps construction teams verify dry lining works before closing walls. Review setting out and critical dimensions, stud specifications, head and base channels, deflection heads, T-junctions, and corners. Check door openings for weight rating, timber inserts, and correct fixings per Knauf details. Confirm services through fire-rated partitions follow approved details, and coordinate with electrical layouts to avoid clashes. Board one side, leave service rips where required, and maintain fire-performing walls. Record issues with photos and notes, assign actions, capture signatures, and export a report.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.