This 1st fix partition handover checklist helps construction teams verify dry lining works before closing walls. Review setting out and critical dimensions, stud specifications, head and base channels, deflection heads, T-junctions, and corners. Check door openings for weight rating, timber inserts, and correct fixings per Knauf details. Confirm services through fire-rated partitions follow approved details, and coordinate with electrical layouts to avoid clashes. Board one side, leave service rips where required, and maintain fire-performing walls. Record issues with photos and notes, assign actions, capture signatures, and export a report.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
