This QA checklist helps site teams verify partitions 1st fix works against project and manufacturer specifications. It covers using the latest drawings, correct setting out, studs and tracks plumb and secured with mastic, spacing at 600 mm (400 mm in wet areas), deflection head and flat plate details, correct board types, fixing patterns, fire and acoustic mastic around penetrations, junction and opening formation, installation of noggins, and readiness for handover. Includes visual, dimensional, and photographic evidence requirements.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.