Use this QA Drywall 1st Fix checklist to standardize quality checks during interior fit-out. Confirm latest drawings and specs, verify setting out, and record visual and dimensional inspections. Check stud alignment and fixings at 600 mm, bathrooms and kitchens at 400 mm, deflection head details, and specified plasterboard types. Ensure party to external junctions are sealed, fire and acoustic mastic applied, corners are square, and all openings are formed correctly. Verify noggins, screed and head strips, clear the plot for handover, and capture signatures with photo evidence.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
