Skip to content
SafetyCulture
Template

Carnation Crop Period 5: End Harvest and 2nd Flush

by Duong Anh Thu, from the Community

Downloads: 0

Use this detailed checklist to manage Carnation cultivation in Period 5, from 29 to 33 weeks after planting. It covers greenhouse hygiene, drainage, water storage, and structural checks; scouting and control for pests and diseases such as thrips, mites, aphids, Botrytis, Pythium, and Fusarium; and general cultivation parameters including soil moisture, shading screens, plant vigor, uniformity, stress symptoms, EC and pH. Follow the schedule for second flush preparation with amino and humic acids, mycorrhiza, fertigation rates, pruning, lowering trellis, and dieback management.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Carnation Crop Period 5 Checklist for Greenhouse Care | Free Template