U-MING Marine Ship Visit Report for Cement Carriers
by Paulkuo 國, from the Community
This ship visit report template is designed for U-MING marine cement carriers. It guides superintendents through a structured inspection covering statutory and class certificates, personnel certifications, PSC and class survey files, drills and maintenance records, and muster lists. Field checks include first-impression hull and deck conditions, mooring arrangements, gangway safety, and crew response. Detailed sections address water ballast tanks, fore and aft peak tanks, and multiple cargo holds, with prompts for ladders, bulkheads, structural members, zinc anodes, piping, and striking plates. Use this template to document findings and ensure safe, compliant operations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
