Skip to content
SafetyCulture
Template

SD12AP Sigma 50 Jump Equipment Check

by Dr Rad, from the Community

Downloads: 0
Get this template

This SD12AP Sigma 50 jump equipment inspection checklist guides riggers through a thorough tandem rig check after every 50 jumps. Review drogue assembly, bridle, kill line, and soft links; assess main canopy, lines, risers, slider, and d-bag connections; and verify reserve assembly including closing loop condition, ripcord seating, and due dates. Confirm container integrity with correct 3 ring assembly, cutaway cable clean and routed through the Collins lanyard, bungee ripcord, main closing loop, and drogue pouch. Record AAD jump count, note any issues with photos, reference applicable service bulletins, log required work, and complete sign off to determine if the rig is good for service.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .