This BRT pre-transportation checklist helps drivers and crews complete critical safety checks before moving A and B trailers. Verify doors, side loaders, isolators, generators, valves, floors and seals, lights, tyres, and trailer-to-prime mover connections. It also covers securing loose items and disconnecting cables, stowing remotes, switching off power and battery panels, and confirming the area is clear prior to departure. Use this guide to reduce incidents and ensure compliant, road-ready equipment.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
