This walk through capture report template helps telecom field teams document assets and issues during network build surveys. Record PN area or feeder route, pole or chamber IDs, addresses or USRN references, and detailed issue descriptions such as bridge crossings, tree cutting, or D-poles. Capture level of impact, required actions, CCN and LOC details, redesign or access constraints, and any special engineering notes. Include Nokia comments as needed, attach photographic field evidence, and add map references to support remediation and handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
