Visionstream UFB - Site Ready for Final Audit Checklist
by Mel Dawson, from the Community
With SafetyCulture you can
With SafetyCulture you can
Description
This document outlines the essential requirements and verification steps needed before requesting a final audit for UFB site completion. It covers three main areas: Civil Works verification including Progress QA completion and Ribbonet Jointing testing, Fibre Works confirmation including aerial and underground installations and exchange work completion, and Documentation requirements such as Civil and Fibre Asbuilts in Viscore. The checklist ensures all critical components are properly completed and documented before proceeding with the final audit process. It serves as a crucial quality control tool for site managers and civil works teams to maintain consistent standards across UFB installations.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.