Skip to content
SafetyCulture
Template

Virgin Media Traditional Build Walk Off Report

by Nelio Goncalves, from the Community

Downloads: 60+
Get this template

This Virgin Media Traditional Build Walk Off Report helps field engineers document completion of network build works. Record site and VM references, access needs, property and floor counts, and compliance with fire safety requirements including fire clips and fire stopping. Capture lock box locations, served properties, cabinet and cable photos, add notes, and complete final sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Virgin Media Traditional Build Walk Off Report | SCCI V1.3 | Free Template