Skip to content
SafetyCulture
Template

Transmission Installation Checklist

by Team Leader Ericsson, from the Community

Downloads: 10+

This transmission installation checklist helps telecom teams verify near and far end setup after installation. It covers outdoor and indoor tasks including antenna and RAU fixation and earthing, IF cable sealing and labeling, proper cable routing to trays, polarization marking, and photographic documentation. For indoor racks, confirm AMM earthing, module screw tightness, dual power sources, and clear labeling of power, IF, Ethernet, and fiber cables, with cabinet photos. Validate radio link configuration for both ends, received level checks, VLAN configuration, traffic routing, DCN with OSPF, network synchronization, and any SID changes. Include print screens and interference test results to complete commissioning and ensure a reliable link.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Transmission Installation Checklist for Telecom Teams | Free Template