This electrical installation checklist supports commissioning of conveyor and material handling systems. It covers general electrical checks, grounding and earthing resistance measurements, IEC-compliant testing records, and verification that all components are installed, labeled, and bonded. Sections include main panel integrity and labeling, cable tray routing and earthing, cable quality and termination, local cabinet bonding, field kit connections, and removal of temporary labels. It also guides Profinet and communications installation, node spacing, segregation from power, terminators, and completion of a network report. Safety measurement records for live and dead tests and calibration certificates for measuring devices are required to ensure safe, standards-compliant start-up.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
