This Toby Box Build checklist guides field crews through safe, compliant street works for telecom or utility installations. Record risk assessment and Red Book compliance, capture pre-start site photos, and evidence CAT & Genny checks. Document installation steps including duct placement, toby location, rope pull to the feeding chamber, and network tie-ins. Track backfill and surface reinstatement to HAUC specifications across footway and carriageway types, with depth and edge sealing photos. Conclude with measurements, grid refs, accurate address details, A55 documentation, and job completion sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
