Skip to content
SafetyCulture
Template

Stonegate 2nd Fix Completion Report Template

by Clive Cooper, from the Community

Downloads: 0
Get this template

Use this 2nd fix completion report to capture site details, confirm electrical power works, verify BT line installation and CLI numbers, record office labelling (OT1, OT2, PC1, PC2), run a 4G speed test in the office, and attach photos of download/upload results. Include cabinet interior shots showing shelf and PDU, note locations of line installs, report faults, and document cleanliness and sign-off from the site representative. Ideal for Stonegate Craft Union locations during telecom installation handover.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.