Skip to content
SafetyCulture
Template

NGA ROW Scoping Document V6 Sprint

by Irtiza Mumtaz, from the Community

Downloads: 80+
Get this template

Use this NGA Right of Way scoping checklist to assess and document network build requirements for multi-dwelling units and shared driveways. Capture connection type, MDU or ROW class, number of end user points, and select the main build methodology including aerial envelope, existing ducts, surface mount, soft or hard surface trenching, slot trench, microtrenching, and drill or thrust. Record duct proving and blockages, pole testing, terminals, drop off location per NETMAP, FAT or cabinet location, aerial feeds, photos, plans, and safety and environmental risks before submission to the ROW mailbox.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

NGA ROW Scoping Document V6 for Sprint Checklist Guide | Free Template