Use this in-progress and post build quality checklist to assess workmanship during and after civil works. Confirm kiln dried sand has been applied and compacted with a plate compactor fitted with a neoprene pad. Check that modules and paving sit within tolerance to adjoining surfaces, with no rocking, and that infills and kerb interfaces are filled to full depth with matching materials and color. Verify CF chamber or cabinet surrounds are reinstated correctly. Inspect sub-base thickness (minimum 100 mm) and bedding material type and depth. Replace any damaged modules with matching type, color, and thickness, and ensure the layout matches the existing pattern. Confirm edging and road kerbs removed or damaged by works are reinstated. Capture the audit type and sign off completion.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
