This D-Pole Network Adjustment V2.0 checklist supports telecom field crews performing adjustments on distribution poles. It captures key job details such as conducted date, contractor and preparer, site location, build town reference, active cabinet number, and PDP number. The template also includes classification of the pole and image capture to document site conditions and work performed. Use it to standardize data collection, ensure traceability, and improve quality across network infrastructure work.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
