Use this CCNA Walk Off - V1.0 checklist to validate Virgin Media O2 cabling works at site handover. Record address, postcode, NBU and survey numbers, the assignee, and completion date. Capture before and after photos, confirm all tasks from the 5.1 comment, and note any outstanding items. Document whether fire stopping was required, attach the fire log report, and add additional information. Ideal for telecom field engineers to standardize installation sign-off and quality assurance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
