Subway Screen Installation Job Completion Checklist
by Leroy Muir, from the Community
Use this practical checklist to complete Subway store screen installations efficiently and safely. Capture time in/out, confirm PPE and sign-in, and perform risk assessment. Remove old boards, install and level screens with adequate fixings (12 points, 50 mm depth), and verify network connectivity via LG settings. Document cable installation with photos, ensure slack and correct labeling, and conceal cables and fixings. Conduct final checks: site tidy, all screens powered and receiving signal, rubbish disposed. Attach photos and obtain signatures for handover.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
