Skip to content
SafetyCulture
Template

Savoy Building Fire Door Inspection

by Peter Cain, from the Community

Downloads: 0
Get this template

Use this Fire Door Inspection checklist to evaluate door frames, leaves, glazing, gaps and clearances, locks and latches, door closers, hinges, panic hardware, seals, threshold devices, and associated hardware on each floor. Record dimensions, materials, ratings (FD30–FD120), door functions, modifications, signage, and overall compliance. Note access constraints, site details, and evidence. Classify door status and document remedial actions to maintain building fire safety and meet standards.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.